Zero export 2026: solar power for your own use only

With zero export, a 6 kWp system keeps 1,425 kWh in the house, throttles away 4,751 kWh and forgoes €366 of feed-in payment a year. A 5 kWh battery cuts the loss to 3,574 kWh.

Checked by Radif Partners · Editorial policy · How we calculate

What zero export costs you

Lost without export

3,574 kWh

Feed-in income forgone per year€275
Self-used stays2,606 kWh
Saving stays€943
Work out a battery →

Zero export (Nulleinspeisung) means a PV system sends no power into the public grid. A meter at the house connection tells the inverter the household load at every moment, and the inverter throttles its output so that nothing flows out through the meter. Financially, the owner gives up the feed-in tariff. On the national average, a south-facing 6 kWp system produces 6,314 kWh a year; a household using 4,000 kWh consumes 1,425 kWh of it. The remaining 4,751 kWh, 75 % of output, would be worth €366 a year at 7.70 ct/kWh, or €7,316 over 20 years. A 5 kWh battery brings much of it into the house and leaves only 3,574 kWh. Under current law, a system without export must still be entered in the Market Master Data Register. The government draft of the EEG 2027 would free such systems from technical duties and pay small new systems only briefly; zero export would then become a serious option.

How zero export works technically

The normal case for a rooftop system is surplus export: whatever the house does not need flows through the bidirectional meter into the grid and is paid for. With zero export, an additional energy meter sits behind the house connection and measures the balance of import and export. As soon as the balance points towards the grid, the inverter throttles until it is back at zero. Short spikes, for instance when a kettle switches off, cannot be avoided entirely; that is why the draft bill speaks of “technically unavoidable” and “negligibly small amounts”. A battery does not change the principle, it only shifts when throttling has to start: the inverter curtails only once the battery is full.

What is lost

What is lost is the part of output that can neither be used immediately nor stored. The quarter-hour simulation with the 74 household load profiles from HTW Berlin shows for a 6 kWp system on the national average:

South 30°, electricity price 36.2 ct/kWh, feed-in tariff 7.70 ct/kWh for comparison.
6 kWp, 4,000 kWhno battery5 kWh battery10 kWh battery
Output6,314 kWh6,314 kWh6,314 kWh
Used at home1,425 kWh2,606 kWh2,958 kWh
Throttled with zero export4,751 kWh3,574 kWh3,225 kWh
Feed-in income forgone per year€366€275€248
Saving on grid power€516€943€1,071

Two things stand out. First, without a battery you give up 75.2 % of the output; on sunny days the system runs at full power for only part of the time. Second, the loss in euros is modest, because the feed-in tariff per kilowatt-hour is only a fraction of the electricity price. The real economics lie in the saving, and that is just as high with zero export as with export. Smaller systems lose proportionally less: 3 kWp with a 5 kWh battery throttle away only 1,052 kWh a year.

Who zero export pays off for

The calculation is simple: zero export costs the feed-in payment the system would otherwise have earned, and saves at most the cost of the meter change and billing. For the 6 kWp system with a 5 kWh battery, that is €275 a year or €5,504 over 20 years, without interest. The equipment you avoid would have to be worth at least that. This works best for small systems sized to the base load, for homes with high daytime consumption, for instance from home working, a heat pump or air conditioning, and for buildings whose connection cannot take additional export. If you fill a large roof, zero export throws away a lot of power and a lot of money. The rule of thumb is therefore: size the system to your consumption first, then decide on export, not the other way round.

Which duties remain

Even without export, the system is connected to the grid, because the house still draws power. Under current law, therefore, a registered electrician notifies the grid operator, who checks the system against its technical connection conditions and may ask for proof that the control really limits export to zero. Entry in the Market Master Data Register remains compulsory, for system and battery; the steps are under Market Master Data Register. The technical requirements of section 9 EEG apply today in principle regardless of export. The 60.0 % cap, by contrast, only concerns systems on the feed-in tariff and has no effect on a system that exports nothing anyway.

Zero export or unpaid export

Besides the tariff, the EEG provides for free acceptance (unentgeltliche Abnahme, section 21(1) sentence 1 no. 2 EEG): the surplus flows into the grid and the grid operator pays nothing. Financially this is the same for the owner as zero export, but technically simpler, as no control at the house connection is needed, and the power gets used rather than discarded. Zero export has its place where the grid operator does not allow export, or only after lengthy grid reinforcement, on outbuildings with a weak connection, or where the owner wants to avoid billing altogether.

Why the topic grows with the EEG 2027

The government draft of the EEG 2027 itself expects more systems to be built without export. New systems below 25 kW would receive no EEG support after a 36-month transition payment; after that, direct marketing, free acceptance or zero export remain. At the same time, the draft exempts zero-export systems from the requirements of the new section 9(2) and from the permanent cap at 50.0 %. For a system connected in 2026, nothing changes: it keeps the EEG 2023 tariff. If you are planning now, it is better to calculate with export and keep zero export as a later option, since switching is a matter of control settings, not of panels. How big the battery should be is shown under battery size, the details of the draft under feed-in tariff 2027.

Questions readers ask

Does a zero-export system have to be registered in the MaStR?

Yes. The registration duty depends on generating power, not on exporting it. Even a system that never sends a kilowatt-hour to the grid is entered within one month of commissioning, with a battery as a separate unit. The explanatory notes to the EEG 2027 draft expressly confirm that this duty remains for zero-export systems.

How much power does a 10 kWp system waste without export?

On the national average with 4,000 kWh consumption, about 8,642 kWh a year, or 82 % of output. At today’s rate that would be €665 of feed-in payment. With an 8 kWh battery, 6,987 kWh are still throttled away. A system that large only makes sense with zero export if consumption is much higher, for example with a heat pump or an electric car.

Do I need a smart meter for zero export?

No. The control uses its own energy meter at the house connection, which the inverter or an energy manager reads several times a second. The grid operator’s meter stays as it is. Because no power flows into the grid, the 60 % cap and the negative-price rule do not matter for such a system, since both concern paid exports only.

Does zero export make sense for a balcony solar kit?

Rarely. A plug-in device up to 800 VA is not paid for exports anyway, and its surplus may legally flow into the grid unpaid. A zero-export control costs extra hardware and only stops your neighbours using the surplus. It makes sense at most with a battery that takes the midday surplus for the evening.

What would the EEG 2027 draft change for zero-export systems?

It exempts systems whose power serves only self-supply and reaches the grid at most in technically unavoidable tiny amounts from the requirements of section 9(2), including the planned cap at 50 %. At the same time, small new systems would get only 36 months of transition payment. The draft has not been passed.

Can I switch a zero-export system to exporting later?

Technically yes; usually a changed control setting is enough. You notify the grid operator and update the register entry. Payment is then made at the rate for the period in which the system was originally commissioned, and under section 25 EEG the 20 years run from that commissioning date, not from the switch. Every year without export is therefore a lost year of support.